---
title: "Secure Construction Site Networks | Control"
description: "Protect BIM data flows and secure temporary construction site networks with physical segmentation, isolating them from the corporate enterprise. Learn why."
lang: en-GB
json-ld: |
  [
    {
      "@context": "https://schema.org",
      "@type": "Organization",
      "@id": "https://fire-vault.com/#organization",
      "name": "Firevault",
      "legalName": "Firevault Limited",
      "url": "https://fire-vault.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://fire-vault.com/logo.png",
        "width": 200,
        "height": 60
      },
      "foundingDate": "2025-03",
      "description": "Protect what matters with Offline Secure Storage and control what moves with Control by Firevault. Physically disconnected, always reachable by you.",
      "address": {
        "@type": "PostalAddress",
        "addressCountry": "GB",
        "addressLocality": "United Kingdom"
      },
      "contactPoint": [
        {
          "@type": "ContactPoint",
          "contactType": "customer service",
          "email": "hello@fire-vault.com",
          "availableLanguage": "English",
          "areaServed": [
            "GB",
            "EU",
            "US",
            "AE"
          ]
        }
      ],
      "sameAs": [
        "https://www.linkedin.com/company/firevault",
        "https://x.com/firevaultuk"
      ],
      "slogan": "Disconnect to Protect",
      "knowsAbout": [
        "Offline Secure Storage",
        "Physical Air Gap Data Protection",
        "Ransomware Protection",
        "Data Sovereignty",
        "GDPR Compliance",
        "NIS2 Compliance"
      ]
    },
    {
      "@context": "https://schema.org",
      "@type": "WebSite",
      "@id": "https://fire-vault.com/#website",
      "name": "Firevault",
      "alternateName": [
        "Firevault",
        "Firevault UK",
        "Firevault Limited"
      ],
      "url": "https://fire-vault.com",
      "publisher": {
        "@id": "https://fire-vault.com/#organization"
      },
      "inLanguage": "en-GB",
      "description": "Protect what matters with Offline Secure Storage and control what moves with Control by Firevault. Physically disconnected, always reachable by you.",
      "potentialAction": {
        "@type": "SearchAction",
        "target": {
          "@type": "EntryPoint",
          "urlTemplate": "https://fire-vault.com/learn?q={search_term_string}"
        },
        "query-input": "required name=search_term_string"
      }
    },
    {
      "@context": "https://schema.org",
      "@type": "WebPage",
      "@id": "https://fire-vault.com/control-for-construction#webpage",
      "url": "https://fire-vault.com/control-for-construction",
      "name": "Secure Construction Site Networks",
      "description": "Protect BIM data flows and secure temporary construction site networks with physical segmentation, isolating them from the corporate enterprise. Learn why.",
      "isPartOf": {
        "@id": "https://fire-vault.com/#website"
      },
      "about": {
        "@id": "https://fire-vault.com/#organization"
      },
      "primaryImageOfPage": {
        "@type": "ImageObject",
        "url": "https://fire-vault.com/images/og/og-base-platform.jpg"
      },
      "inLanguage": "en-GB",
      "breadcrumb": {
        "@id": "https://fire-vault.com/control-for-construction#breadcrumb"
      }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "@id": "https://fire-vault.com/control-for-construction#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Home",
          "item": "https://fire-vault.com"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Secure Construction Site Networks",
          "item": "https://fire-vault.com/control-for-construction"
        }
      ]
    }
  ]
---

Recent Breaches 

Breaches 

[2026 PowerSchool 62.4M records ](/learn/breaches)[2026 DISA Global Solutions 3.3M records ](/learn/breaches)[2026 Globe Life 850K records ](/learn/breaches)[2026 Lidl GB Customer contact data ](/learn/breaches)[2026 Asahi Group Production systems disrupted ](/learn/breaches)[2026 Kido International 8K records ](/learn/breaches)[2026 Collins Aerospace (RTX) Check-in and boarding disruptio... ](/learn/breaches)[2026 Jaguar Land Rover Production and IT systems disru... ](/learn/breaches)[2026 Peter Green Chilled Order and logistics data ](/learn/breaches)[2026 Adidas UK Customer contact details ](/learn/breaches)[2026 PowerSchool 62.4M records ](/learn/breaches)[2026 DISA Global Solutions 3.3M records ](/learn/breaches)[2026 Globe Life 850K records ](/learn/breaches)[2026 Lidl GB Customer contact data ](/learn/breaches)[2026 Asahi Group Production systems disrupted ](/learn/breaches)[2026 Kido International 8K records ](/learn/breaches)[2026 Collins Aerospace (RTX) Check-in and boarding disruptio... ](/learn/breaches)[2026 Jaguar Land Rover Production and IT systems disru... ](/learn/breaches)[2026 Peter Green Chilled Order and logistics data ](/learn/breaches)[2026 Adidas UK Customer contact details ](/learn/breaches)

[View All →](/learn/breaches)

[![Firevault - offline secure storage, physically disconnected from the internet](/assets/logo-color-DBVl0KCg.png)](/)

Products

Solutions

[Why OSS](/why-oss)

More

[Help](/help)[Get started](/get-started)

Construction 

# Site Network and BIM Data Path Governance 

Construction projects involve dozens of contractors sharing temporary networks on active sites. BIM models, structural calculations, and building management systems contain sensitive data that defines the physical security of the built environment.

-   BIM data theft
-   Contractor account compromise
-   Site Wi-Fi intrusion
-   Ransomware on project systems

Schedule a Demo[Back to Control](/solutions/control)

![Construction site with tower cranes at dusk](/assets/sector-square-construction-CEACpkgz.jpg)

Exposure

How it worksExplore moreQuestions

The exposure in numbers 

01 

BIM data path isolation from site networks

100% BIM data path isolation from site networks 

02 

Persistent contractor access between visits

Zero Persistent contractor access between visits 

03 

Site network zones with independent governance

4 Site network zones with independent governance 

04 

BIM security and ISO 19650 compliance

Full BIM security and ISO 19650 compliance 

The Challenge 

## Construction sites present unique network risks.

01 

### BIM Data Exposure

Building Information Models contain detailed structural, mechanical, and security system data that, if stolen, reveals the physical vulnerabilities of critical buildings.

02 

### Multi-Contractor Access

Dozens of subcontractors share temporary site networks with varying security standards, each creating potential entry points for attackers.

03 

### Temporary Infrastructure

Construction site networks are inherently temporary and often lack the security controls applied to permanent corporate infrastructure.

Construction

> A stolen BIM model does not just represent intellectual property loss. It provides a complete blueprint of a building's physical security systems, structural weaknesses, and access points.

The Scenario

### Scenario: BIM Data Theft from Critical Infrastructure Project

A subcontractor's laptop, connected to the construction site Wi-Fi, is compromised through an unpatched vulnerability. The attacker uses the site network to access the BIM collaboration server, downloading complete structural and security system models for a new government building. The models reveal every security camera location, access control point, and structural reinforcement detail. With Control, the BIM collaboration environment is physically separated from the general site network. Subcontractor access to BIM data requires multi-party authorisation and operates within controlled time windows. The compromised laptop cannot reach BIM systems because the path does not exist.

"We found the BIM model for a Ministry of Defence facility on a contractor's personal laptop. It contained the complete security system layout, structural details, and utility routing. The contractor had left the project six months earlier."

Module deployment · construction network 

## Where each Control module is deployed across office, project, site and supply chain.

Construction networks carry an office estate, project systems that hold BIM and designs, site networks that link plant and IoT, and a deep supply chain. Control puts a real boundary at the places that matter.

Grounded in PAS 1192-5 / ISO 19650-5 and NCSC supply chain guidance.

C0 

Internet / Cloud

External

Cloud services 

Common Data Env 

![FV-Firebreak module icon](/assets/firebreak-icon-7zSCkB1t.png)Firebreak ![FV-Validate module icon](/assets/vault-icon-CD3Pv4ri.png)Validate 

External traffic stops at the perimeter.

C1 

Head office IT

IT

Office 

SOC 

Finance 

![FV-Isolate module icon](/assets/isolate-icon-B9t8fl3o.png)Isolate ![FV-Validate module icon](/assets/vault-icon-CD3Pv4ri.png)Validate 

Office cannot reach project systems on its own terms.

C2 

Project systems

IT

BIM 

Design 

Project mgmt 

Where the designs live.

Where the designs live.

![FV-Transfer module icon](/assets/transfer-icon-DqGa0PQI.png)Transfer ![FV-Lock module icon](/assets/lock-icon-UU3vOaKE.png)Lock 

Designs move to site on a named, controlled route.

C3 

Site systems

Field

Site network 

Plant IoT 

Telemetry 

![FV-Relay module icon](/assets/relay-icon-CVhJDRO7.png)Relay ![FV-Firebreak module icon](/assets/firebreak-icon-7zSCkB1t.png)Firebreak ![FV-Unlink module icon](/assets/unlink-icon-B8GFAVW1.png)Unlink 

Supplier access opens on a schedule.

VND 

Supply chain

DMZ · trust boundary

Subcontractors 

Suppliers 

OSS 

Crown jewels

Off-network

Detail callout · A

Offline Secure Storage

Designs, contracts, drawings, evidence and any record you have to keep recoverable.

Offline by design · secure by default 

Modules & symbols

![FV-Firebreak module icon](/assets/firebreak-icon-7zSCkB1t.png)Firebreak Physical sever 

![FV-Validate module icon](/assets/vault-icon-CD3Pv4ri.png)Validate Integrity check 

![FV-Isolate module icon](/assets/isolate-icon-B9t8fl3o.png)Isolate Zone boundary 

![FV-Transfer module icon](/assets/transfer-icon-DqGa0PQI.png)Transfer Controlled move 

![FV-Lock module icon](/assets/lock-icon-UU3vOaKE.png)Lock Named access 

![FV-Relay module icon](/assets/relay-icon-CVhJDRO7.png)Relay Time-bound path 

![FV-Unlink module icon](/assets/unlink-icon-B8GFAVW1.png)Unlink Remove trust 

DMZ boundary Trust transition 

OSS callout Off-network detail 

### Where each module is deployed, and what it does there.

One row per module. Placement on the network, then plain-English purpose at that point.

1.  ![FV-Firebreak module icon](/assets/firebreak-icon-7zSCkB1t.png)
    
    Firebreak
    
    On the C0 to C1 link and the supply chain link
    
    Real hardware off switches on the public and supplier boundaries, ready to cut the live path the moment a supply chain incident is called.
    
2.  ![FV-Validate module icon](/assets/vault-icon-CD3Pv4ri.png)
    
    Validate
    
    On the C0 to C1 link and the C1 to C2 link
    
    Requests crossing into project systems are checked for origin, integrity and authority.
    
3.  ![FV-Isolate module icon](/assets/isolate-icon-B9t8fl3o.png)
    
    Isolate
    
    On the C1 to C2 link
    
    Office and project systems sit on their own fabrics. A compromise in office does not reach the designs.
    
4.  ![FV-Transfer module icon](/assets/transfer-icon-DqGa0PQI.png)
    
    Transfer
    
    On the C2 to C3 link
    
    When designs and data move to site, Transfer governs the route and the landing point.
    
5.  ![FV-Lock module icon](/assets/lock-icon-UU3vOaKE.png)
    
    Lock
    
    On the C2 to C3 link
    
    Site access ties to named users with the right role.
    
6.  ![FV-Relay module icon](/assets/relay-icon-CVhJDRO7.png)
    
    Relay
    
    On the supply chain link
    
    Supplier access opens for the window of work and not a minute more.
    
7.  ![FV-Unlink module icon](/assets/unlink-icon-B8GFAVW1.png)
    
    Unlink
    
    On the supply chain link
    
    When a supplier engagement ends, Unlink removes the persistent connection and the inherited trust.
    

Featured In

[![TechRadar Pro logo](/press/techradar-pro-logo.svg) ](https://www.techradar.com/pro/uk-startup-put-physical-disconnect-switch-in-its-cloud-storage-offering-to-mitigate-ransomware-attacks-but-will-that-be-enough "Read about Firevault on TechRadar Pro") [![Yahoo Finance logo](/assets/yahoo-finance-logo-white-aNkUpCH7.png) ](https://uk.finance.yahoo.com/news/firevault-launches-help-businesses-directors-074500961.html "Read about Firevault on Yahoo Finance") [![Channel Insider logo](/assets/channel-insider-logo-white-CFFo4iu7.png) ](https://www.channelinsider.com/security/tools-and-platforms/firevault-security-offline-platform-offering/ "Read about Firevault on Channel Insider") [![Security Buyer logo](/assets/security-buyer-logo-white-o6oIaBWz.png) ](https://securitybuyer.com/uk-cybersecurity-startup-launches-firevault/ "Read about Firevault on Security Buyer") [![SecurityBrief logo](data:image/png;base64,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) ](https://securitybrief.com.au/story/firevault-unveils-offline-digital-vault-to-combat-rising-cyber-risks "Read about Firevault on SecurityBrief") 

Capabilities

## What you get with every deployment

01 

### Sovereign Project Data

All BIM models and project data remain within the agreed jurisdiction in secured Firevault Bunkers, meeting government construction security requirements.

02 

### Multi-Contractor Governance

Each contractor organisation receives isolated access paths with independent authorisation and logging, preventing cross-contractor compromise.

03 

### ISO 19650 Compliance

Automated compliance logging supports ISO 19650 information management requirements and government construction security standards.

04 

### Site Cellular Management

Out-of-band management via cellular connectivity ensures governance capability independent of temporary site network infrastructure.

05 

### Project Audit Trail

Every access to BIM data and building systems is recorded in tamper-proof logs that persist beyond the construction phase.

06 

### Project Data Archive

Verified baselines of project configuration ensure long-term preservation beyond the life of temporary construction site infrastructure.

Demo to Live

## Adoption Guide

Step 1 

#### Project Security Assessment

Assess BIM data sensitivity, contractor access requirements, and building management system connectivity for the project or estate.

Step 2 

#### Site Zone Architecture

Design physically separated zones for general site access, BIM collaboration, building management, and corporate project systems.

Step 3 

#### Single Site Pilot

Deploy on a representative construction site with full contractor access governance, BIM data isolation, and compliance logging.

Step 4 

#### Estate-Wide Adoption

Standardised deployment across all construction sites with centralised data archives, continuous compliance evidence, and cellular management.

Step 1 

#### Project Security Assessment

Assess BIM data sensitivity, contractor access requirements, and building management system connectivity for the project or estate.

Step 2 

#### Site Zone Architecture

Design physically separated zones for general site access, BIM collaboration, building management, and corporate project systems.

Step 3 

#### Single Site Pilot

Deploy on a representative construction site with full contractor access governance, BIM data isolation, and compliance logging.

Step 4 

#### Estate-Wide Adoption

Standardised deployment across all construction sites with centralised data archives, continuous compliance evidence, and cellular management.

[Organise a Demo](/contact)

Relevant Control Blueprints

## Deployment patterns that apply here

[

CP-03 FIRE+VAULT 

### Control Third-Party Access

Give third parties access without giving them a permanent doorway.

View blueprint ](/control-blueprints/cp-03)[

CP-04 FIRE 

### Enforce Physical Segmentation

Segmentation should not just be logical. It should be physically enforceable.

View blueprint ](/control-blueprints/cp-04)[

CP-06 VAULT 

### Prove Compliance Through Control

Compliance becomes stronger when control can be demonstrated, not just documented.

View blueprint ](/control-blueprints/cp-06)

## Explore More

[

### Supply Chain Threat

Disconnect third-party paths when not in active use.

Learn more about Supply Chain Threat ](/control-for-supply-chain-risk)[

### Control for Public Sector

Government network isolation and classified data paths.

Learn more about Control for Public Sector ](/control-for-public-sector)

Questions

## Frequently Asked

How does Control work on temporary construction sites? 

Can multiple contractor organisations access BIM data simultaneously? 

How is BIM data protected after project completion? 

Does Control support government construction security requirements? 

Construction blueprint - PoC

### Speak to the team to organise a PoC

Walk through your blueprint with the Firevault team and scope a proof of concept on your estate. 30 minutes, no sales pitch.

Book a PoC conversation