Control PlanCP-19Autonomous System Intervention
Proposed Control Plan. Subject to technical and publication approval.
An autonomous system acts beyond its remit. Which network connections can you withdraw?
Disconnect the communications of an autonomous system.
- Plan
- CP-19
- Purpose
- Autonomous System Intervention
- Selected connections
- 8
- Modules
- Fracture · Isolate · Execute · Validate · Anchor · Lock
- Scope
- Registered external communications and authorised management crossings.
What is at stake
Why autonomous system intervention matters.
The operating risk includes both continued access and the consequences of losing it.
The problem today
Where you are IP connected today.
CP-19 reviews eight IP-connected paths in your business. While a path stays connected over IP, it is a route that can be reached, misused or exploited. Each path below carries its own risk to agree with its owner.
- Risk 1Autonomous external crossing · All physical members and parallel paths to be mapped.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected within approved operating scope
- Risk 2Remote instruction route · All physical members and parallel paths to be mapped.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected within approved operating scope
- Risk 3Engineering management path · All physical members and parallel paths to be mapped.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected by default
- Risk 4External service boundary · All physical members and parallel paths to be mapped.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected within approved operating scope
- Risk 5Review workspace crossing · All physical members and parallel paths to be mapped.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected by default
- Risk 6Secondary site route · All physical members and parallel paths to be mapped.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected within approved operating scope
- Risk 7Equipment integration conduit · All physical members and parallel paths to be mapped.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected within approved operating scope
- Risk 8Internet service crossing · All physical members and parallel paths to be mapped.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected within approved operating scope
Matching industry Blueprints
What Firevault changes
What changes with this Plan.
Withdraw selected autonomous network connections while assessing local behaviour separately.
| Connection | Agreed normal state | Control action |
|---|---|---|
| Autonomous external crossing · All physical members and parallel paths to be mapped. | Connected within approved operating scope | Isolate groups registered conduits; Fracture withdraws each authorised connection; Execute applies the action. |
| Remote instruction route · All physical members and parallel paths to be mapped. | Connected within approved operating scope | Fracture withdraws this authorised connection. Validate checks authority before action. |
| Engineering management path · All physical members and parallel paths to be mapped. | Disconnected by default | Fracture withdraws this authorised connection. Validate checks authority before action. |
| External service boundary · All physical members and parallel paths to be mapped. | Connected within approved operating scope | Fracture withdraws this authorised connection. Validate checks authority before action. |
| Review workspace crossing · All physical members and parallel paths to be mapped. | Disconnected by default | Fracture withdraws this authorised connection. Validate checks authority before action. |
| Secondary site route · All physical members and parallel paths to be mapped. | Connected within approved operating scope | Fracture withdraws this authorised connection. Validate checks authority before action. |
| Equipment integration conduit · All physical members and parallel paths to be mapped. | Connected within approved operating scope | Fracture withdraws this authorised connection. Validate checks authority before action. |
| Internet service crossing · All physical members and parallel paths to be mapped. | Connected within approved operating scope | Fracture withdraws this authorised connection. Validate checks authority before action. |
Local execution, model shutdown, physical stopping and unregistered communication channels.
Control in Action
Autonomous System Intervention: see the selected path change.
Withdraw selected autonomous network connections while assessing local behaviour separately.
Control in Action
Stage
Before agreed physical control
The operating risk includes both continued access and the consequences of losing it.Connected routes require review. Discovery checks your real dependencies.
Physical crossings
- Autonomous external crossing · All physical members and parallel paths to be mapped.Always connected
- Remote instruction route · All physical members and parallel paths to be mapped.Always connected
- Engineering management path · All physical members and parallel paths to be mapped.Always connected
- External service boundary · All physical members and parallel paths to be mapped.Always connected
- Recovery access (OSS)Not in place
- FBFracture · Review the purpose and ownership of each selected connection.
Illustrative selected connections, not an approved deployment. Agree service dependencies and authorised actions before implementation. This illustration does not predict attack reach or service availability. Offline Secure Storage® remains separate.
The modules involved
The Control modules behind this Plan.
In CP-19: withdraws the scoped external path. In CP-19: groups every registered autonomous-zone conduit. In CP-19: applies the authorised communications intervention.
CP-19Autonomous System Intervention
This Control Plan
Withdraw selected autonomous network connections while assessing local behaviour separately.
Primary modules: Fracture, Isolate, Execute, Validate, Anchor and Lock.
Read the operational detailModule in this plan
Fracture
Physically disconnects network paths to prevent unauthorised access, contain threats and stop an attack from progressing.
Physically disconnects network paths to prevent unauthorised access, contain threats and stop an attack from progressing.
Explore the Fracture moduleConcept illustration. Select any module to see what it does. Placement is drawn from your own network in discovery.
Control Plans that work alongside CP-19
CP-18 · ProposedData Exfiltration InterruptionInterrupt outbound paths at a physical boundary.Open CP-18
CP-20 · ProposedMulti-Party AuthorisationTwo independent approvals required before a connection opens.Open CP-20
CP-17 · ProposedChange Window EnforcementApproved changes made through a timed physical connection.Open CP-17The Control Plan specification
Each selected connection, written down.
Withdraw selected autonomous network connections while assessing local behaviour separately.
Autonomous external crossing · All physical members and parallel paths to be mapped.Connected within approved operating scope
- Normal state
- Connected within approved operating scope
- Authorisation
- Authorised intervention after scope and operational-impact review
- Module action
- Isolate groups registered conduits; Fracture withdraws each authorised connection; Execute applies the action.
- Business effect
- Connectivity across this crossing is lost. Assess affected supervision, tools and local dependencies.
- Failure behaviour
- Specify, justify and test power-loss and fault behaviour before approval.
Remote instruction route · All physical members and parallel paths to be mapped.Connected within approved operating scope
- Normal state
- Connected within approved operating scope
- Authorisation
- Authorised intervention after scope and operational-impact review
- Module action
- Fracture withdraws this authorised connection. Validate checks authority before action.
- Business effect
- Connectivity across this crossing is lost. Assess affected supervision, tools and local dependencies.
- Failure behaviour
- Specify, justify and test power-loss and fault behaviour before approval.
Engineering management path · All physical members and parallel paths to be mapped.Disconnected by default
- Normal state
- Disconnected by default
- Authorisation
- Authorised intervention after scope and operational-impact review
- Module action
- Fracture withdraws this authorised connection. Validate checks authority before action.
- Business effect
- Connectivity across this crossing is lost. Assess affected supervision, tools and local dependencies.
- Failure behaviour
- Specify, justify and test power-loss and fault behaviour before approval.
External service boundary · All physical members and parallel paths to be mapped.Connected within approved operating scope
- Normal state
- Connected within approved operating scope
- Authorisation
- Authorised intervention after scope and operational-impact review
- Module action
- Fracture withdraws this authorised connection. Validate checks authority before action.
- Business effect
- Connectivity across this crossing is lost. Assess affected supervision, tools and local dependencies.
- Failure behaviour
- Specify, justify and test power-loss and fault behaviour before approval.
Review workspace crossing · All physical members and parallel paths to be mapped.Disconnected by default
- Normal state
- Disconnected by default
- Authorisation
- Authorised intervention after scope and operational-impact review
- Module action
- Fracture withdraws this authorised connection. Validate checks authority before action.
- Business effect
- Connectivity across this crossing is lost. Assess affected supervision, tools and local dependencies.
- Failure behaviour
- Specify, justify and test power-loss and fault behaviour before approval.
Secondary site route · All physical members and parallel paths to be mapped.Connected within approved operating scope
- Normal state
- Connected within approved operating scope
- Authorisation
- Authorised intervention after scope and operational-impact review
- Module action
- Fracture withdraws this authorised connection. Validate checks authority before action.
- Business effect
- Connectivity across this crossing is lost. Assess affected supervision, tools and local dependencies.
- Failure behaviour
- Specify, justify and test power-loss and fault behaviour before approval.
Equipment integration conduit · All physical members and parallel paths to be mapped.Connected within approved operating scope
- Normal state
- Connected within approved operating scope
- Authorisation
- Authorised intervention after scope and operational-impact review
- Module action
- Fracture withdraws this authorised connection. Validate checks authority before action.
- Business effect
- Connectivity across this crossing is lost. Assess affected supervision, tools and local dependencies.
- Failure behaviour
- Specify, justify and test power-loss and fault behaviour before approval.
Internet service crossing · All physical members and parallel paths to be mapped.Connected within approved operating scope
- Normal state
- Connected within approved operating scope
- Authorisation
- Authorised intervention after scope and operational-impact review
- Module action
- Fracture withdraws this authorised connection. Validate checks authority before action.
- Business effect
- Connectivity across this crossing is lost. Assess affected supervision, tools and local dependencies.
- Failure behaviour
- Specify, justify and test power-loss and fault behaviour before approval.
Local execution, model shutdown, physical stopping and unregistered communication channels.
Operational runbook
Who does what, and when.
What happens under normal conditions, during approved work, when an incident is detected and when connections are restored.
Withdraw selected autonomous network connections while assessing local behaviour separately. Each selected connection sits at its agreed normal state.
Anchor
Set in the Plan, signed off by your operational, security and continuity leads.
Connection states, continuously.
Isolate groups registered conduits; Fracture withdraws each authorised connection; Execute applies the action.
Validate
Lock
The named owner approves each opening in advance.
Request, approval, opening and closure.
Your security tools raise an alert. The agreed action starts out of band, without depending on the network under attack.
Execute
Pre-authorised in the Plan. The incident owner is told at once.
The alert and the action taken.
Withdraw selected autonomous network connections while assessing local behaviour separately.
Fracture
Isolate
Automatic only for the crossings you agreed. Anything else needs the incident owner.
Each action, timestamped.
Restoring a physical path is a new operating decision. Review the current system state, outstanding risks and authority before reconnecting.
The operational owner authorises each reconnection.
Each check and each reconnection.
Local execution, model shutdown, physical stopping and unregistered communication channels.
Engineering and integration
Fit the control around your existing environment.
Registered external communications and authorised management crossings.
Testing and evidence
Prove the selected connection before relying on it.
Agree acceptance criteria with the service owner, then retain the observed results.
Resilience and recovery
Offline Secure Storage®
OSS protects stored business data, recovery copies and retained evidence through physical disconnection. It is a separate storage service, not a Control module or a network containment function.
Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.
Restoring a physical path is a new operating decision. Review the current system state, outstanding risks and authority before reconnecting.
Explore Offline Secure StorageFrameworks and limitations
Support your obligations. Keep the boundaries clear.
Local execution, model shutdown, physical stopping and unregistered communication channels.
Build your Control Plan
Start with the connections you would cut first.
Use this draft register to discuss connection scope and unresolved operating decisions. It is a discovery aid, not an approved deployment configuration.
Questions worth asking
Before you rely on CP-19.
Practical questions for the people who own these connections.
Withdraw selected autonomous network connections while assessing local behaviour separately.
Registered external communications and authorised management crossings.
Not by assumption. Map dependencies and agree the acceptable service impact with the operational owner before selecting a path.
Local execution, model shutdown, physical stopping and unregistered communication channels.
Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.
Use this draft register to discuss connection scope and unresolved operating decisions. It is a discovery aid, not an approved deployment configuration.
Your next step
Take the next step with autonomous system intervention.
Use this draft register to discuss connection scope and unresolved operating decisions. It is a discovery aid, not an approved deployment configuration.
Book a briefing