Control Plan **CP-15**Operational Technology Protection

Proposed Control Plan. Subject to technical and publication approval.

# Your process depends on OT. Which connections could put it at risk?

Image: CP-15 Operational Technology Protection Control Plan icon (https://fire-vault.com/__l5e/assets-v1/15b8a2eb-b5a0-41e9-aac9-093ff362430d/CP-15_operational-technology-protection.png)

Industrial controllers behind a physical network boundary.

Book a briefing: https://fire-vault.com/demo
See Control in Action

Plan

CP-15

Purpose

Operational Technology Protection

Selected connections

8

Modules

Fracture · Isolate · Relay · Execute · Validate · Anchor

Scope

The assessed IT-to-OT crossing, support, management and alternate conduits.

What is at stake

## Why operational technology protection matters.

Assess the IT-to-OT crossing with the OT operations owner. Record dependencies, approval conditions and verification evidence before a physical connection is changed.

**Unnecessary exposure**The IT to OT conduits can remain available beyond the approved need.

**Service impact**Loss of supervisory or support access needs operational approval. This Plan is not a safety system.

**Unclear authority**Name the OT operations owner and the conditions for a connection change.

**Unverified closure**Check the observed state of the IT to OT conduits, including parallel routes.

The problem today

## Where you are IP connected today.

CP-15 reviews eight IP-connected paths in your business. While a path stays connected over IP, it is a route that can be reached, misused or exploited. Each path below carries its own risk to agree with its owner.

**8**IP-connected paths reviewed

**8**Risks to agree with owners

**6**Control modules applied

1. _Risk 1_**IT-to-OT conduit**
   Corporate or engineering access to the assessed OT access zone.
   Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
   **Agreed state:** Connected
2. _Risk 2_**Supplier support route**
   Support gateway to engineering access.
   Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
   **Agreed state:** Disconnected by default
3. _Risk 3_**Engineering management**
   Engineering services to managed OT assets.
   Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
   **Agreed state:** Disconnected by default
4. _Risk 4_**Process interface**
   OT access zone to the local controller environment.
   Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
   **Agreed state:** Connected
5. _Risk 5_**Approved exchange**
   Assessed data exchange service to engineering services.
   Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
   **Agreed state:** Disconnected by default
6. _Risk 6_**Parallel conduit**
   Redundant fibre, copper or wireless gateway route.
   Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
   **Agreed state:** Connected
7. _Risk 7_**Alternate support path**
   Independent vendor or cellular gateway uplink.
   Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
   **Agreed state:** To assess
8. _Risk 8_**External gateway**
   Assessed OT external communications link.
   Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
   **Agreed state:** Connected

Matching industry Blueprints

BP-01 · utilities water (https://fire-vault.com/control-blueprint/utilities-water)BP-14 · critical infrastructure (https://fire-vault.com/control-blueprint/critical-infrastructure)BP-20 · utilities renewables (https://fire-vault.com/control-blueprint/utilities-renewables)

What Firevault changes

## What changes with this Plan.

Keep local process control within the defined physical boundary.

| Connection | Agreed normal state | Control action |
| --- | --- | --- |
| IT-to-OT conduit | Connected | Isolate operates the grouped conduits. |
| Supplier support route | Disconnected by default | Relay opens a time-bound window; Validate checks the approval. |
| Engineering management | Disconnected by default | Relay governs the approved window; Fracture withdraws the connection. |
| Process interface | Connected | Fracture withdraws the authorised connection. |
| Approved exchange | Disconnected by default | Transfer governs what moves; Relay limits the window. |
| Parallel conduit | Connected | Isolate groups every conduit. |
| Alternate support path | To assess | Unlink removes persistent dependencies that bypass the control. |
| External gateway | Connected | Fracture withdraws the selected connection. |

Detection, malware removal, device radios and safety-system design. Stored data protection is scoped separately.

Control in Action

## Operational Technology Protection: see the selected path change.

Control in Action

Stage

Before agreed physical control

Assess the IT-to-OT crossing with the OT operations owner. Record dependencies, approval conditions and verification evidence before a physical connection is changed.**Connected routes require review. Discovery checks your real dependencies.**

**0**reached by the attack

**10**still running

Physical crossings

- IT-to-OT conduit _Always connected_
- Supplier support route _Always connected_
- Engineering management _Always connected_
- Process interface _Always connected_
- Recovery access (OSS) _Not in place_
1. _FB_**Fracture** · Review the purpose and ownership of each selected connection.

Illustrative selected connections, not an approved deployment. Agree service dependencies and authorised actions before implementation. This illustration does not predict attack reach or service availability. Offline Secure Storage® remains separate.

The modules involved

## The Control modules behind this Plan.

In CP-15: group C1 and C6, and any other assessed bypass. In CP-15: define the controller environment and its permitted physical connections. In CP-15: apply only the operationally approved boundary action.

### CP-15Operational Technology Protection

Z0 Requesting environment

Z1 Protected systems

Z2 Related operations

Held in Offline Secure Storage® Selected recovery material, held separately

Out-of-band command path

This Control Plan

#### Keep local process control within the defined physical boundary.

Primary modules: Fracture, Isolate, Relay, Execute, Validate and Anchor.

Read the operational detail

Module in this plan

Image: Fracture module icon (https://fire-vault.com/__l5e/assets-v1/f709a192-16d2-4206-86f3-842a3200db9d/firebreak-icon.png)

#### Fracture

Controls the path

Physically disconnects network paths to prevent unauthorised access, contain threats and stop an attack from progressing.

Explore the Fracture module (https://fire-vault.com/control/modules/fracture)

Concept illustration. Select any module to see what it does. Placement is drawn from your own network in discovery.

Control Plans that work alongside CP-15

**CP-14 · Proposed****Compromised Device Isolation**Physically isolate one affected device from the network. _Open CP-14_: https://fire-vault.com/control-plan/compromised-device-isolation
**CP-16 · Proposed****Remote Site Isolation**Disconnect the communications link to a remote facility. _Open CP-16_: https://fire-vault.com/control-plan/remote-site-isolation
**CP-13 · Proposed****Maintenance Window Control**Connections that exist only for a scheduled maintenance window. _Open CP-13_: https://fire-vault.com/control-plan/maintenance-window-control

See all Control Plans: https://fire-vault.com/control#blueprints
How Control works: https://fire-vault.com/control

As featured in

- Read about Firevault on TechRadar Pro: https://www.techradar.com/pro/uk-startup-put-physical-disconnect-switch-in-its-cloud-storage-offering-to-mitigate-ransomware-attacks-but-will-that-be-enough
- Read about Firevault on Yahoo Finance: https://uk.finance.yahoo.com/news/firevault-launches-help-businesses-directors-074500961.html
- Read about Firevault on Channel Insider: https://www.channelinsider.com/security/tools-and-platforms/firevault-security-offline-platform-offering/
- Read about Firevault on Security Buyer: https://securitybuyer.com/uk-cybersecurity-startup-launches-firevault/
- Read about Firevault on SecurityBrief: https://securitybrief.com.au/story/firevault-unveils-offline-digital-vault-to-combat-rising-cyber-risks

The Control Plan specification

## Each selected connection, written down.

IT-to-OT conduitCorporate or engineering access to the assessed OT access zone._Connected_

Normal state

Connected

Authorisation

Tier 2Operations and incident owner approval

Module action

Isolate operates the grouped conduits.

Business effect

Remote access to OT is lost; local control is assessed separately.

Failure behaviour

Assessed and tested with operations

Supplier support routeSupport gateway to engineering access._Disconnected by default_

Normal state

Disconnected by default

Authorisation

Tier 2Approved support window

Module action

Relay opens a time-bound window; Validate checks the approval.

Business effect

Supplier support is unavailable outside the window.

Failure behaviour

Assessed and tested with operations

Engineering managementEngineering services to managed OT assets._Disconnected by default_

Normal state

Disconnected by default

Authorisation

Tier 2Named maintenance request

Module action

Relay governs the approved window; Fracture withdraws the connection.

Business effect

Engineering changes cannot cross this route while disconnected.

Failure behaviour

Assessed and tested with operations

Process interfaceOT access zone to the local controller environment._Connected_

Normal state

Connected

Authorisation

Tier 2Operational and safety review

Module action

Fracture withdraws the authorised connection.

Business effect

Supervisory visibility may be lost; do not assume autonomous operation.

Failure behaviour

Assessed and tested with operations

Approved exchangeAssessed data exchange service to engineering services._Disconnected by default_

Normal state

Disconnected by default

Authorisation

Tier 2Approved transfer purpose

Module action

Transfer governs what moves; Relay limits the window.

Business effect

Transfers pause without changing the stored data.

Failure behaviour

Assessed and tested with operations

Parallel conduitRedundant fibre, copper or wireless gateway route._Connected_

Normal state

Connected

Authorisation

Tier 2Same approval as C1

Module action

Isolate groups every conduit.

Business effect

Redundancy is withdrawn with the primary path.

Failure behaviour

Assessed and tested with operations

Alternate support pathIndependent vendor or cellular gateway uplink._To assess_

Normal state

To assess

Authorisation

Tier 2Boundary review

Module action

Unlink removes persistent dependencies that bypass the control.

Business effect

Out-of-band vendor access needs separate assessment.

Failure behaviour

Assessed and tested with operations

External gatewayAssessed OT external communications link._Connected_

Normal state

Connected

Authorisation

Tier 2Joint operational decision

Module action

Fracture withdraws the selected connection.

Business effect

External telemetry and support may be unavailable.

Failure behaviour

Assessed and tested with operations

Operational runbook

## Who does what, and when.

What happens under normal conditions, during approved work, when an incident is detected and when connections are restored.

Stage What happens Who decides On record

_1_Normal operation **Agreed states held**

Keep local process control within the defined physical boundary. Each selected connection sits at its agreed normal state.Anchor

Set in the Plan, signed off by your operational, security and continuity leads.

Connection states, continuously.

_2_Approved work **Booked, bounded access**

Isolate operates the grouped conduits.Relay Validate

The named owner approves each opening in advance.

Request, approval, opening and closure.

_3_Incident detected **Act on the alert**

Your security tools raise an alert. The agreed action starts out of band, without depending on the network under attack.Execute

Pre-authorised in the Plan. The incident owner is told at once.

The alert and the action taken.

_4_Controlled response **Change the agreed crossings**

Keep local process control within the defined physical boundary.Fracture Isolate

Automatic only for the crossings you agreed. Anything else needs the incident owner.

Each action, timestamped.

_5_Reconnection **Check before reopening**

The operational owner authorises each reconnection.

Each check and each reconnection.

Engineering and integration

## Fit the control around your existing environment.

**Map the complete boundary**Confirm cabling, redundant links and alternate routes. A selected physical cut does not remove paths outside its scope.

**Agree an independent command route**Confirm the available command methods for the selected hardware. Command delivery can be affected by coverage, roaming and handshakes.

**Test the effect, not just the command**Verify the observed link state, service dependencies and failure behaviour in an agreed test window.

Testing and evidence

## Prove the selected connection before relying on it.

Agree acceptance criteria with the service owner, then retain the observed results.

**Normal service**Check the agreed service state and alternate paths.

**Controlled change**Verify approved opening, closure and the operational impact.

**Recovery and failure**Test reconnection checks, loss of power and loss of the command route.

Resilience and recovery

## Offline Secure Storage®

OSS protects stored business data, recovery copies and retained evidence through physical disconnection. It is a separate storage service, not a Control module or a network containment function.

Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.

Explore Offline Secure Storage (https://fire-vault.com/offline-secure-storage)

Frameworks and limitations

## Support your obligations. Keep the boundaries clear.

**What this addresses**Keep local process control within the defined physical boundary.

**What it does not replace**Detection, malware removal, device radios and safety-system design. Stored data protection is scoped separately.

**Evidence agreed for the deployment**Specify the requests, approvals, commands, observed states and test results to retain. Logging capability and retention depend on the selected design.

Build your Control Plan

## Start with the connections you would cut first.

Which routes cross the IT-to-OT crossing? Which dependencies fail when they are withdrawn? Who can approve the local operating state? Use the draft register to prepare a review, not as deployment approval.

Questions worth asking

## Before you rely on CP-15.

Practical questions for the people who own these connections.

Not by assumption. Map dependencies and agree the acceptable service impact with the operational owner before selecting a path.

Your next step

## Take the next step with operational technology protection.

Book a briefing (https://fire-vault.com/demo)

Prefer to talk first? Speak to the team: https://fire-vault.com/contact

Book a briefing: https://fire-vault.com/demo
Speak to the team: https://fire-vault.com/contact

## Structured data

```json
[
  {
    "@context": "https://schema.org",
    "@type": "Organization",
    "@id": "https://fire-vault.com/#organization",
    "name": "Firevault",
    "legalName": "Firevault Limited",
    "url": "https://fire-vault.com",
    "logo": {
      "@type": "ImageObject",
      "url": "https://fire-vault.com/logo.png",
      "width": 200,
      "height": 60
    },
    "foundingDate": "2025-03",
    "description": "Firevault is a UK cyber resilience company. Data protection and storage through Offline Secure Storage. Network evolution and rapid protection through Control.",
    "address": {
      "@type": "PostalAddress",
      "addressCountry": "GB",
      "addressLocality": "United Kingdom"
    },
    "contactPoint": [
      {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "hello@fire-vault.com",
        "availableLanguage": "English",
        "areaServed": [
          "GB",
          "EU",
          "US",
          "AE"
        ]
      },
      {
        "@type": "ContactPoint",
        "contactType": "sales",
        "email": "sales@fire-vault.com",
        "availableLanguage": "English",
        "areaServed": [
          "GB",
          "EU",
          "US",
          "AE"
        ]
      }
    ],
    "founder": [
      {
        "@type": "Person",
        "name": "Mark Fermor",
        "jobTitle": "Founder, CTO and CMO"
      },
      {
        "@type": "Person",
        "name": "David Bailey",
        "jobTitle": "Founder and CEO"
      }
    ],
    "areaServed": [
      "United Kingdom",
      "Europe",
      "United States",
      "Middle East"
    ],
    "sameAs": [
      "https://www.linkedin.com/company/firevault",
      "https://x.com/firevaultuk"
    ],
    "slogan": "Disconnect to Protect",
    "brand": [
      {
        "@type": "Brand",
        "name": "Offline Secure Storage"
      },
      {
        "@type": "Brand",
        "name": "Control by Firevault"
      },
      {
        "@type": "Brand",
        "name": "Firebreak"
      }
    ],
    "knowsAbout": [
      "Offline Secure Storage",
      "Physically disconnected data storage",
      "Physical Air Gap Data Protection",
      "Ransomware Protection",
      "Ransomware recovery",
      "3-2-1-1-0 backup rule",
      "AI kill switch",
      "Operational technology security",
      "Critical national infrastructure resilience",
      "Data Sovereignty",
      "GDPR Compliance",
      "NIS2 Compliance",
      "DORA Compliance",
      "NCSC Cyber Assessment Framework"
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "WebSite",
    "@id": "https://fire-vault.com/#website",
    "name": "Firevault",
    "alternateName": [
      "Firevault",
      "Firevault UK",
      "Firevault Limited"
    ],
    "url": "https://fire-vault.com",
    "publisher": {
      "@id": "https://fire-vault.com/#organization"
    },
    "inLanguage": "en-GB",
    "description": "Firevault is a UK cyber resilience company. Data protection and storage through Offline Secure Storage. Network evolution and rapid protection through Control.",
    "potentialAction": {
      "@type": "SearchAction",
      "target": {
        "@type": "EntryPoint",
        "urlTemplate": "https://fire-vault.com/learn?q={search_term_string}"
      },
      "query-input": "required name=search_term_string"
    }
  },
  {
    "@context": "https://schema.org",
    "@type": "WebPage",
    "@id": "https://fire-vault.com/control-plan/operational-technology-protection#webpage",
    "url": "https://fire-vault.com/control-plan/operational-technology-protection",
    "name": "CP-15 Operational Technology Protection",
    "description": "Industrial controllers behind a physical network boundary.",
    "isPartOf": {
      "@id": "https://fire-vault.com/#website"
    },
    "about": {
      "@id": "https://fire-vault.com/#organization"
    },
    "primaryImageOfPage": {
      "@type": "ImageObject",
      "url": "https://fire-vault.com/images/og/og-base-platform.jpg"
    },
    "inLanguage": "en-GB",
    "breadcrumb": {
      "@id": "https://fire-vault.com/control-plan/operational-technology-protection#breadcrumb"
    }
  },
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "@id": "https://fire-vault.com/control-plan/operational-technology-protection#breadcrumb",
    "itemListElement": [
      {
        "@type": "ListItem",
        "position": 1,
        "name": "Home",
        "item": "https://fire-vault.com"
      },
      {
        "@type": "ListItem",
        "position": 2,
        "name": "Control Plan",
        "item": "https://fire-vault.com/control-plan"
      },
      {
        "@type": "ListItem",
        "position": 3,
        "name": "CP-15 Operational Technology Protection",
        "item": "https://fire-vault.com/control-plan/operational-technology-protection"
      }
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "WebPage",
    "name": "CP-15 Operational Technology Protection",
    "description": "Industrial controllers behind a physical network boundary.",
    "url": "https://fire-vault.com/control-plan/operational-technology-protection"
  }
]
```