Control PlanCP-13Maintenance Window Control
Proposed Control Plan. Subject to technical and publication approval.
Connections for the maintenance window, not a standing route.
Connections that exist only for a scheduled maintenance window.
- Plan
- CP-13
- Purpose
- Maintenance Window Control
- Selected connections
- 6
- Modules
- Relay · Execute · Validate · Anchor · Lock · Transfer
- Scope
- Scheduled servicing, vendor diagnostics and equipment support on named physical crossings.
What is at stake
Why maintenance window control matters.
A service connection can outlive the authority that justified it.
The problem today
Where you are IP connected today.
CP-13 reviews six IP-connected paths in your business. While a path stays connected over IP, it is a route that can be reached, misused or exploited. Each path below carries its own risk to agree with its owner.
- Risk 1Maintenance workstation to servicing gateway
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected
- Risk 2Vendor support gateway to equipment network
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected
- Risk 3Admin workstation to equipment management
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected
- Risk 4Servicing network to production equipment
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected
- Risk 5Diagnostic staging network to analysis environment
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected
- Risk 6Secondary service port to maintenance network
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected
What Firevault changes
What changes with this Plan.
Connections exist only for a scheduled maintenance window.
| Connection | Agreed normal state | Control action |
|---|---|---|
| Maintenance workstation to servicing gateway | Disconnected | Relay limits servicing access; Execute applies approved closure. |
| Vendor support gateway to equipment network | Disconnected | Validate checks vendor task approval; Relay opens the support entry. |
| Admin workstation to equipment management | Disconnected | Execute closes the management crossing after the approved task. |
| Servicing network to production equipment | Disconnected | Validate checks equipment approval; Relay opens the service boundary. |
| Diagnostic staging network to analysis environment | Disconnected | Transfer governs diagnostic movement; Execute closes the artefact crossing. |
| Secondary service port to maintenance network | Disconnected | Relay opens only the approved secondary service connection. |
Task safety validation, identity management and software deployment correctness.
Control in Action
Maintenance Window Control: see the selected path change.
Connections exist only for a scheduled maintenance window.
Control in Action
Stage
Before agreed physical control
A service connection can outlive the authority that justified it.Connected routes require review. Discovery checks your real dependencies.
Physical crossings
- Maintenance workstation to servicing gatewayAlways connected
- Vendor support gateway to equipment networkAlways connected
- Admin workstation to equipment managementAlways connected
- Servicing network to production equipmentAlways connected
- Recovery access (OSS)Not in place
- RERelay · Review the purpose and ownership of each selected connection.
Illustrative selected connections, not an approved deployment. Agree service dependencies and authorised actions before implementation. This illustration does not predict attack reach or service availability. Offline Secure Storage® remains separate.
The modules involved
The Control modules behind this Plan.
In CP-13: governs the approved servicing period. In CP-13: checks the owner, task and approved window. In CP-13: applies the approved closure or authorised extension action.
CP-13Maintenance Window Control
This Control Plan
Connections exist only for a scheduled maintenance window.
Primary modules: Relay, Execute, Validate, Anchor, Lock and Transfer.
Read the operational detailModule in this plan
Relay
Establishes connectivity only when authorised, for a defined purpose and a limited time, before removing the network path again.
Establishes connectivity only when authorised, for a defined purpose and a limited time, before removing the network path again.
Explore the Relay moduleConcept illustration. Select any module to see what it does. Placement is drawn from your own network in discovery.
Control Plans that work alongside CP-13
CP-12 · ProposedPrivileged Access ControlAdministrator access through a controlled network entry point.Open CP-12
CP-14 · ProposedCompromised Device IsolationPhysically isolate one affected device from the network.Open CP-14
CP-11 · ProposedSupply Chain IsolationKeep supplier networks separate from your own environment.Open CP-11The Control Plan specification
Each selected connection, written down.
Connections exist only for a scheduled maintenance window.
Maintenance workstation to servicing gatewayDisconnected
- Normal state
- Disconnected
- Authorisation
- 1 · Approved servicing window ends and safe closure conditions are met
- Module action
- Relay limits servicing access; Execute applies approved closure.
- Business effect
- Remote servicing commands stop.
- Failure behaviour
- Disconnected on fault; confirm equipment can tolerate lost servicing access.
Vendor support gateway to equipment networkDisconnected
- Normal state
- Disconnected
- Authorisation
- 2 · Maintenance owner approves a named vendor diagnostic task
- Module action
- Validate checks vendor task approval; Relay opens the support entry.
- Business effect
- Vendor diagnostics and remote support stop.
- Failure behaviour
- Disconnected on power loss; vendor access requires renewed approval.
Admin workstation to equipment managementDisconnected
- Normal state
- Disconnected
- Authorisation
- 1 · Approved management task completes or authority is withdrawn
- Module action
- Execute closes the management crossing after the approved task.
- Business effect
- Remote equipment configuration stops.
- Failure behaviour
- Disconnected on fault; use the tested local management procedure.
Servicing network to production equipmentDisconnected
- Normal state
- Disconnected
- Authorisation
- 2 · Equipment owner approves service access and safe withdrawal conditions
- Module action
- Validate checks equipment approval; Relay opens the service boundary.
- Business effect
- Remote servicing of production equipment stops; local operation remains separately assessed.
- Failure behaviour
- Designed to disconnect on fault; equipment owner must approve safe loss of access.
Diagnostic staging network to analysis environmentDisconnected
- Normal state
- Disconnected
- Authorisation
- 1 · Approved diagnostic export completes
- Module action
- Transfer governs diagnostic movement; Execute closes the artefact crossing.
- Business effect
- Diagnostic uploads stop; collected local artefacts remain.
- Failure behaviour
- Disconnected on fault; reconcile incomplete diagnostic files before retrying.
Secondary service port to maintenance networkDisconnected
- Normal state
- Disconnected
- Authorisation
- 2 · Maintenance owner approves fallback after primary interface failure
- Module action
- Relay opens only the approved secondary service connection.
- Business effect
- Fallback servicing stops; primary access remains separately controlled.
- Failure behaviour
- Disconnected on power loss; no automatic fallback opening is permitted.
Task safety validation, identity management and software deployment correctness.
Operational runbook
Who does what, and when.
What happens under normal conditions, during approved work, when an incident is detected and when connections are restored.
Connections exist only for a scheduled maintenance window. Each selected connection sits at its agreed normal state.
Anchor
Transfer
Set in the Plan, signed off by your operational, security and continuity leads.
Connection states, continuously.
Relay limits servicing access; Execute applies approved closure.
Relay
Validate
Lock
The named owner approves each opening in advance.
Request, approval, opening and closure.
Your security tools raise an alert. The agreed action starts out of band, without depending on the network under attack.
Execute
Pre-authorised in the Plan. The incident owner is told at once.
The alert and the action taken.
Connections exist only for a scheduled maintenance window.
Automatic only for the crossings you agreed. Anything else needs the incident owner.
Each action, timestamped.
A physical boundary does not prove task completion or device remediation. Apply the agreed evidence and owner checks.
The operational owner authorises each reconnection.
Each check and each reconnection.
Task safety validation, identity management and software deployment correctness.
Engineering and integration
Fit the control around your existing environment.
Scheduled servicing, vendor diagnostics and equipment support on named physical crossings.
Testing and evidence
Prove the selected connection before relying on it.
Agree acceptance criteria with the service owner, then retain the observed results.
Resilience and recovery
Offline Secure Storage®
OSS protects stored business data, recovery copies and retained evidence through physical disconnection. It is a separate storage service, not a Control module or a network containment function.
Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.
A physical boundary does not prove task completion or device remediation. Apply the agreed evidence and owner checks.
Explore Offline Secure StorageFrameworks and limitations
Support your obligations. Keep the boundaries clear.
Task safety validation, identity management and software deployment correctness.
Build your Control Plan
Start with the connections you would cut first.
Use these proposed entries to prepare a discovery discussion. Identify connection owners, alternatives, approved states and unresolved dependencies. Selections are not deployment instructions.
Questions worth asking
Before you rely on CP-13.
Practical questions for the people who own these connections.
Connections exist only for a scheduled maintenance window.
Scheduled servicing, vendor diagnostics and equipment support on named physical crossings.
Not by assumption. Map dependencies and agree the acceptable service impact with the operational owner before selecting a path.
Task safety validation, identity management and software deployment correctness.
Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.
Use these proposed entries to prepare a discovery discussion. Identify connection owners, alternatives, approved states and unresolved dependencies. Selections are not deployment instructions.
Your next step
Take the next step with maintenance window control.
Use these proposed entries to prepare a discovery discussion. Identify connection owners, alternatives, approved states and unresolved dependencies. Selections are not deployment instructions.
Book a briefing