Control PlanCP-05Critical Asset Protection
Protect essential systems without treating the process like office IT.
CP-05 keeps selected routes into essential systems within planned physical boundaries, while enterprise access, maintenance and transfers remain deliberate and approved.
- Plan
- CP-05
- Purpose
- Critical Asset Protection
- Selected connections
- 4
- Modules
- Anchor · Validate · Relay · Transfer · Execute · Fracture
- Scope
- Selected enterprise, maintenance and exchange routes into an essential environment.
What is at stake
Why critical asset protection matters.
Essential systems often depend on legacy equipment, remote sites and specialist support. Sudden disconnection can create its own operational risk, so boundaries must be designed with operations.
The problem today
Where you are IP connected today.
CP-05 reviews four IP-connected paths in your business. While a path stays connected over IP, it is a route that can be reached, misused or exploited. Each path below carries its own risk to agree with its owner.
- Risk 1Enterprise to essential systems
The selected link between business networks and the essential environment.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected only where required for service
- Risk 2Maintenance route
The route used by engineers or suppliers for approved maintenance.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected outside approved windows
- Risk 3Approved data exchange
The path used to move reports, configurations or updates across the boundary.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected outside approved exchanges
- Risk 4Local control and safety functions
The process functions needed to keep the service safe.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Not assumed disconnectable
What Firevault changes
What changes with this Plan.
Keep essential systems within planned connection boundaries, with maintenance and data exchange routes opened only for approved purposes.
| Connection | Agreed normal state | Control action |
|---|---|---|
| Enterprise to essential systems | Connected only where required for service | Validate checks both approvals. Execute initiates the action. Fracture withdraws the link. |
| Maintenance route | Disconnected outside approved windows | Validate checks the request. Relay opens the route. Fracture withdraws it afterwards. |
| Approved data exchange | Disconnected outside approved exchanges | Validate checks the request. Transfer makes the exchange path available. Fracture withdraws it afterwards. |
| Local control and safety functions | Not assumed disconnectable | No automatic Control action is assumed. |
CP-05 does not change process logic, provide safety functions, detect threats or remove malware. Routes outside the approved register need separate control.
Control in Action
Critical Asset Protection: see the selected path change.
Keep essential systems within planned connection boundaries, with maintenance and data exchange routes opened only for approved purposes.
Control in Action
Stage
Before agreed physical control
Essential systems often depend on legacy equipment, remote sites and specialist support. Sudden disconnection can create its own operational risk, so boundaries must be designed with operations.Connected routes require review. Discovery checks your real dependencies.
Physical crossings
- Enterprise to essential systemsAlways connected
- Maintenance routeAlways connected
- Approved data exchangeAlways connected
- Local control and safety functionsConnected · ready to cut
- Recovery access (OSS)Not in place
- ARAnchor · Review the purpose and ownership of each selected connection.
Illustrative selected connections, not an approved deployment. Agree service dependencies and authorised actions before implementation. This illustration does not predict attack reach or service availability. Offline Secure Storage® remains separate.
The modules involved
The Control modules behind this Plan.
Keeps critical assets within defined physical connection boundaries. Checks authority and purpose before a maintenance, transfer or response action. Opens a selected route for approved maintenance and closes it afterwards. Makes an approved exchange path available between separate environments. Initiates the approved action on the designated connection. Physically withdraws the selected route.
CP-05Critical Asset Protection
This Control Plan
Keep essential systems within planned connection boundaries, with maintenance and data exchange routes opened only for approved purposes.
Primary modules: Fracture, Relay, Execute, Validate, Anchor and Transfer.
Read the operational detailModule in this plan
Fracture
Physically disconnects network paths to prevent unauthorised access, contain threats and stop an attack from progressing.
Physically disconnects network paths to prevent unauthorised access, contain threats and stop an attack from progressing.
Explore the Fracture moduleConcept illustration. Select any module to see what it does. Placement is drawn from your own network in discovery.
Control Plans that work alongside CP-05
CP-04Physical Network SegmentationZones separated at Layer 1, so a boundary holds even when software controls are compromised.Open CP-04
CP-06Controlled Access & AssuranceConnect approvals and observed control states to agreed record sources, with collection and retention defined for the actions in scope.Open CP-06
CP-03Third-Party Access ControlSupplier and vendor paths that exist only for approved work, in a defined window.Open CP-03The Control Plan specification
Each selected connection, written down.
Keep essential systems within planned connection boundaries, with maintenance and data exchange routes opened only for approved purposes.
Enterprise to essential systemsThe selected link between business networks and the essential environment.Connected only where required for service
- Normal state
- Connected only where required for service
- Authorisation
- Incident owner and operations owner approval
- Module action
- Validate checks both approvals. Execute initiates the action. Fracture withdraws the link.
- Business effect
- Business access pauses. Local operation must be confirmed before approval.
- Failure behaviour
- Behaviour agreed with operations and tested.
Maintenance routeThe route used by engineers or suppliers for approved maintenance.Disconnected outside approved windows
- Normal state
- Disconnected outside approved windows
- Authorisation
- Approved work order and operational readiness
- Module action
- Validate checks the request. Relay opens the route. Fracture withdraws it afterwards.
- Business effect
- Maintenance access is available only for the approved work.
- Failure behaviour
- Remains disconnected unless an approved recovery procedure is followed.
Approved data exchangeThe path used to move reports, configurations or updates across the boundary.Disconnected outside approved exchanges
- Normal state
- Disconnected outside approved exchanges
- Authorisation
- Approved exchange request
- Module action
- Validate checks the request. Transfer makes the exchange path available. Fracture withdraws it afterwards.
- Business effect
- Exchange runs only through the approved path and window.
- Failure behaviour
- Remains disconnected unless an approved recovery procedure is followed.
Local control and safety functionsThe process functions needed to keep the service safe.Not assumed disconnectable
- Normal state
- Not assumed disconnectable
- Authorisation
- Outside automatic action
- Module action
- No automatic Control action is assumed.
- Business effect
- Operational and safety dependencies remain with the system owner.
- Failure behaviour
- Assess separately with operations and safety owners.
CP-05 does not change process logic, provide safety functions, detect threats or remove malware. Routes outside the approved register need separate control.
Operational runbook
Who does what, and when.
What happens under normal conditions, during approved work, when an incident is detected and when connections are restored.
Keep essential systems within planned connection boundaries, with maintenance and data exchange routes opened only for approved purposes. Each selected connection sits at its agreed normal state.
Anchor
Transfer
Set in the Plan, signed off by your operational, security and continuity leads.
Connection states, continuously.
Validate checks both approvals. Execute initiates the action. Fracture withdraws the link.
Validate
Relay
The named owner approves each opening in advance.
Request, approval, opening and closure.
Your security tools raise an alert. The agreed action starts out of band, without depending on the network under attack.
Execute
Pre-authorised in the Plan. The incident owner is told at once.
The alert and the action taken.
Keep essential systems within planned connection boundaries, with maintenance and data exchange routes opened only for approved purposes.
Fracture
Automatic only for the crossings you agreed. Anything else needs the incident owner.
Each action, timestamped.
Before reconnection, operations confirm the service state and the security owner confirms the agreed checks.
The operational owner authorises each reconnection.
Each check and each reconnection.
CP-05 does not change process logic, provide safety functions, detect threats or remove malware. Routes outside the approved register need separate control.
Engineering and integration
Fit the control around your existing environment.
Selected enterprise, maintenance and exchange routes into an essential environment.
Testing and evidence
Prove the selected connection before relying on it.
Agree acceptance criteria with the service owner, then retain the observed results.
Resilience and recovery
Offline Secure Storage®
OSS protects stored business data, recovery copies and retained evidence through physical disconnection. It is a separate storage service, not a Control module or a network containment function.
Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.
Before reconnection, operations confirm the service state and the security owner confirms the agreed checks.
Explore Offline Secure StorageFrameworks and limitations
Support your obligations. Keep the boundaries clear.
CP-05 does not change process logic, provide safety functions, detect threats or remove malware. Routes outside the approved register need separate control.
Build your Control Plan
Start with the connections you would cut first.
Start with one maintenance route and confirm the local operation and safety dependencies around it.
Questions worth asking
Before you rely on CP-05.
Practical questions for the people who own these connections.
Keep essential systems within planned connection boundaries, with maintenance and data exchange routes opened only for approved purposes.
Selected enterprise, maintenance and exchange routes into an essential environment.
Not by assumption. Map dependencies and agree the acceptable service impact with the operational owner before selecting a path.
CP-05 does not change process logic, provide safety functions, detect threats or remove malware. Routes outside the approved register need separate control.
Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.
Start with one maintenance route and confirm the local operation and safety dependencies around it.
Your next step
Take the next step with critical asset protection.
Start with one maintenance route and confirm the local operation and safety dependencies around it.
Book a briefing