Control PlanCP-15Operational Technology Protection
Proposed Control Plan. Subject to technical and publication approval.
Your process depends on OT. Which connections could put it at risk?
Industrial controllers behind a physical network boundary.
- Plan
- CP-15
- Purpose
- Operational Technology Protection
- Selected connections
- 8
- Modules
- Fracture · Isolate · Relay · Execute · Validate · Anchor
- Scope
- The assessed IT-to-OT crossing, support, management and alternate conduits.
What is at stake
Why operational technology protection matters.
Assess the IT-to-OT crossing with the OT operations owner. Record dependencies, approval conditions and verification evidence before a physical connection is changed.
The problem today
Where you are IP connected today.
CP-15 reviews eight IP-connected paths in your business. While a path stays connected over IP, it is a route that can be reached, misused or exploited. Each path below carries its own risk to agree with its owner.
- Risk 1IT-to-OT conduit
Corporate or engineering access to the assessed OT access zone.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected
- Risk 2Supplier support route
Support gateway to engineering access.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected by default
- Risk 3Engineering management
Engineering services to managed OT assets.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected by default
- Risk 4Process interface
OT access zone to the local controller environment.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected
- Risk 5Approved exchange
Assessed data exchange service to engineering services.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Disconnected by default
- Risk 6Parallel conduit
Redundant fibre, copper or wireless gateway route.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected
- Risk 7Alternate support path
Independent vendor or cellular gateway uplink.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: To assess
- Risk 8External gateway
Assessed OT external communications link.
Whenever this path is open over IP, it is a route that can be reached, misused or exploited.
Agreed state: Connected
Matching industry Blueprints
BP-01 · utilities waterBP-14 · critical infrastructureBP-20 · utilities renewablesWhat Firevault changes
What changes with this Plan.
Keep local process control within the defined physical boundary.
| Connection | Agreed normal state | Control action |
|---|---|---|
| IT-to-OT conduit | Connected | Isolate operates the grouped conduits. |
| Supplier support route | Disconnected by default | Relay opens a time-bound window; Validate checks the approval. |
| Engineering management | Disconnected by default | Relay governs the approved window; Fracture withdraws the connection. |
| Process interface | Connected | Fracture withdraws the authorised connection. |
| Approved exchange | Disconnected by default | Transfer governs what moves; Relay limits the window. |
| Parallel conduit | Connected | Isolate groups every conduit. |
| Alternate support path | To assess | Unlink removes persistent dependencies that bypass the control. |
| External gateway | Connected | Fracture withdraws the selected connection. |
Detection, malware removal, device radios and safety-system design. Stored data protection is scoped separately.
Control in Action
Operational Technology Protection: see the selected path change.
Keep local process control within the defined physical boundary.
Control in Action
Stage
Before agreed physical control
Assess the IT-to-OT crossing with the OT operations owner. Record dependencies, approval conditions and verification evidence before a physical connection is changed.Connected routes require review. Discovery checks your real dependencies.
Physical crossings
- IT-to-OT conduitAlways connected
- Supplier support routeAlways connected
- Engineering managementAlways connected
- Process interfaceAlways connected
- Recovery access (OSS)Not in place
- FBFracture · Review the purpose and ownership of each selected connection.
Illustrative selected connections, not an approved deployment. Agree service dependencies and authorised actions before implementation. This illustration does not predict attack reach or service availability. Offline Secure Storage® remains separate.
The modules involved
The Control modules behind this Plan.
In CP-15: group C1 and C6, and any other assessed bypass. In CP-15: define the controller environment and its permitted physical connections. In CP-15: apply only the operationally approved boundary action.
CP-15Operational Technology Protection
This Control Plan
Keep local process control within the defined physical boundary.
Primary modules: Fracture, Isolate, Relay, Execute, Validate and Anchor.
Read the operational detailModule in this plan
Fracture
Physically disconnects network paths to prevent unauthorised access, contain threats and stop an attack from progressing.
Physically disconnects network paths to prevent unauthorised access, contain threats and stop an attack from progressing.
Explore the Fracture moduleConcept illustration. Select any module to see what it does. Placement is drawn from your own network in discovery.
Control Plans that work alongside CP-15
CP-14 · ProposedCompromised Device IsolationPhysically isolate one affected device from the network.Open CP-14
CP-16 · ProposedRemote Site IsolationDisconnect the communications link to a remote facility.Open CP-16
CP-13 · ProposedMaintenance Window ControlConnections that exist only for a scheduled maintenance window.Open CP-13The Control Plan specification
Each selected connection, written down.
Keep local process control within the defined physical boundary.
IT-to-OT conduitCorporate or engineering access to the assessed OT access zone.Connected
- Normal state
- Connected
- Authorisation
- Tier 2Operations and incident owner approval
- Module action
- Isolate operates the grouped conduits.
- Business effect
- Remote access to OT is lost; local control is assessed separately.
- Failure behaviour
- Assessed and tested with operations
Supplier support routeSupport gateway to engineering access.Disconnected by default
- Normal state
- Disconnected by default
- Authorisation
- Tier 2Approved support window
- Module action
- Relay opens a time-bound window; Validate checks the approval.
- Business effect
- Supplier support is unavailable outside the window.
- Failure behaviour
- Assessed and tested with operations
Engineering managementEngineering services to managed OT assets.Disconnected by default
- Normal state
- Disconnected by default
- Authorisation
- Tier 2Named maintenance request
- Module action
- Relay governs the approved window; Fracture withdraws the connection.
- Business effect
- Engineering changes cannot cross this route while disconnected.
- Failure behaviour
- Assessed and tested with operations
Process interfaceOT access zone to the local controller environment.Connected
- Normal state
- Connected
- Authorisation
- Tier 2Operational and safety review
- Module action
- Fracture withdraws the authorised connection.
- Business effect
- Supervisory visibility may be lost; do not assume autonomous operation.
- Failure behaviour
- Assessed and tested with operations
Approved exchangeAssessed data exchange service to engineering services.Disconnected by default
- Normal state
- Disconnected by default
- Authorisation
- Tier 2Approved transfer purpose
- Module action
- Transfer governs what moves; Relay limits the window.
- Business effect
- Transfers pause without changing the stored data.
- Failure behaviour
- Assessed and tested with operations
Parallel conduitRedundant fibre, copper or wireless gateway route.Connected
- Normal state
- Connected
- Authorisation
- Tier 2Same approval as C1
- Module action
- Isolate groups every conduit.
- Business effect
- Redundancy is withdrawn with the primary path.
- Failure behaviour
- Assessed and tested with operations
Alternate support pathIndependent vendor or cellular gateway uplink.To assess
- Normal state
- To assess
- Authorisation
- Tier 2Boundary review
- Module action
- Unlink removes persistent dependencies that bypass the control.
- Business effect
- Out-of-band vendor access needs separate assessment.
- Failure behaviour
- Assessed and tested with operations
External gatewayAssessed OT external communications link.Connected
- Normal state
- Connected
- Authorisation
- Tier 2Joint operational decision
- Module action
- Fracture withdraws the selected connection.
- Business effect
- External telemetry and support may be unavailable.
- Failure behaviour
- Assessed and tested with operations
Detection, malware removal, device radios and safety-system design. Stored data protection is scoped separately.
Operational runbook
Who does what, and when.
What happens under normal conditions, during approved work, when an incident is detected and when connections are restored.
Keep local process control within the defined physical boundary. Each selected connection sits at its agreed normal state.
Anchor
Set in the Plan, signed off by your operational, security and continuity leads.
Connection states, continuously.
Isolate operates the grouped conduits.
Relay
Validate
The named owner approves each opening in advance.
Request, approval, opening and closure.
Your security tools raise an alert. The agreed action starts out of band, without depending on the network under attack.
Execute
Pre-authorised in the Plan. The incident owner is told at once.
The alert and the action taken.
Keep local process control within the defined physical boundary.
Fracture
Isolate
Automatic only for the crossings you agreed. Anything else needs the incident owner.
Each action, timestamped.
Assess the IT-to-OT crossing with the OT operations owner. Record dependencies, approval conditions and verification evidence before a physical connection is changed.
The operational owner authorises each reconnection.
Each check and each reconnection.
Detection, malware removal, device radios and safety-system design. Stored data protection is scoped separately.
Engineering and integration
Fit the control around your existing environment.
The assessed IT-to-OT crossing, support, management and alternate conduits.
Testing and evidence
Prove the selected connection before relying on it.
Agree acceptance criteria with the service owner, then retain the observed results.
Resilience and recovery
Offline Secure Storage®
OSS protects stored business data, recovery copies and retained evidence through physical disconnection. It is a separate storage service, not a Control module or a network containment function.
Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.
Assess the IT-to-OT crossing with the OT operations owner. Record dependencies, approval conditions and verification evidence before a physical connection is changed.
Explore Offline Secure StorageFrameworks and limitations
Support your obligations. Keep the boundaries clear.
Detection, malware removal, device radios and safety-system design. Stored data protection is scoped separately.
Build your Control Plan
Start with the connections you would cut first.
Which routes cross the IT-to-OT crossing? Which dependencies fail when they are withdrawn? Who can approve the local operating state? Use the draft register to prepare a review, not as deployment approval.
Questions worth asking
Before you rely on CP-15.
Practical questions for the people who own these connections.
Keep local process control within the defined physical boundary.
The assessed IT-to-OT crossing, support, management and alternate conduits.
Not by assumption. Map dependencies and agree the acceptable service impact with the operational owner before selecting a path.
Detection, malware removal, device radios and safety-system design. Stored data protection is scoped separately.
Control by Firevault governs selected physical connections. Existing detection tools and authorised operators decide when to act. OSS does not detect incidents, command Control or replace operational safety procedures.
Which routes cross the IT-to-OT crossing? Which dependencies fail when they are withdrawn? Who can approve the local operating state? Use the draft register to prepare a review, not as deployment approval.
Your next step
Take the next step with operational technology protection.
Which routes cross the IT-to-OT crossing? Which dependencies fail when they are withdrawn? Who can approve the local operating state? Use the draft register to prepare a review, not as deployment approval.
Book a briefing